An uninterruptible power supply is bought once, installed in a cupboard, and forgotten until a power cut — at which point the organisation discovers what it actually bought.

Two things go wrong. The unit was sized on capacity rather than runtime, so it lasts four minutes instead of twenty. Or the batteries died eighteen months ago and nobody noticed, so it lasts zero.

Capacity and runtime are different questions

Capacity (VA or watts) is how much load the unit can support. Runtime is how long it supports that load. They trade against each other: the same unit that runs a small load for an hour runs a large one for minutes.

A 1500VA UPS is not "a 1500VA amount of time". At near-full load, typical small units deliver five to ten minutes. At quarter load, the same unit may run for forty.

So the sizing question is not "how big" — it is "how long do I need, at the load I actually have?"

Work out what you need the runtime for

The answer depends entirely on what should happen during an outage. There are three honest scenarios:

Ride out short interruptions. Most outages are brief — seconds to a couple of minutes. Five to ten minutes of runtime covers the majority and prevents the ungraceful shutdowns that actually damage equipment and corrupt data. For many small offices this is enough.

Shut down gracefully. You need enough time to detect the outage, signal connected systems, and let them shut down cleanly. Fifteen to twenty minutes is typical, and this requires shutdown software configured and tested — a UPS with no shutdown integration only delays the ungraceful stop.

Keep working. Running through an extended outage needs substantially more runtime, external battery packs, or a generator. This is a different conversation with a different budget, and it belongs in business continuity planning rather than equipment selection.

Decide which you are buying before comparing products.

Measuring the load properly

Nameplate ratings on equipment are maximums and typically far above actual draw. Sizing on nameplate produces an oversized, expensive unit.

Measure instead:

  • use a plug-in power meter on each device, or
  • read actual load from an existing UPS or intelligent PDU, or
  • for servers, use the management interface, which usually reports power draw

Then add headroom — 20–25% for growth, and because running a UPS at its limit shortens battery life and leaves nothing for a new device.

The decision most people skip: what goes on it

Not everything in the rack needs protecting, and protecting the wrong things wastes runtime.

Should be on the UPS: servers and storage, the network switches those servers depend on, the firewall and the router. There is no point in a server surviving if the switch it connects through does not.

Often overlooked: the switch providing PoE to access points and phones. If the phone system is cloud-based, losing the switch means losing phones — including during the emergency that may have caused the outage.

Usually should not be: monitors, printers, desk equipment, anything with a motor or heater. These consume runtime for no benefit.

Never: laser printers. The fuser draws enormous current in bursts and can trip the UPS or damage it.

Topology, briefly

Standby (offline) — cheapest, switches to battery on failure with a brief transfer time. Adequate for individual workstations.

Line-interactive — regulates voltage without going to battery, which handles sags and surges and extends battery life. The right default for small server rooms and network equipment.

Online (double conversion) — always runs the load from the inverter, so there is no transfer time and the output is clean regardless of input. For sensitive equipment, poor mains quality, or anything where a few milliseconds matters.

For a typical small comms room, line-interactive is usually the correct balance. Online is worth it where power quality is genuinely poor — which you will know, because equipment fails more often than it should.

The part that gets skipped: maintenance

A UPS is a battery, and batteries degrade. Sealed lead-acid batteries in a typical office environment last three to five years, less if the room is warm. Lithium units last longer and cost more.

What needs to happen, and almost never does:

  • Note the install date and diarise replacement before the end of expected life
  • Run a self-test monthly, and read the result — most units support this remotely
  • Run a real load test annually: pull the mains and confirm the actual runtime. This is the only way to know what you have
  • Monitor and alert. The unit will report battery faults, overload and on-battery events. That should reach a person
  • Keep the room cool. Heat is the main driver of battery degradation
  • Verify shutdown integration still works after any server or OS change. Shutdown agents break silently

The annual load test is the one that matters most, and it is also the one people avoid because it means deliberately interrupting power. Schedule it outside hours, and treat a shorter-than-expected runtime as the finding it is.

A short specification exercise

  1. Measure the actual load of everything that must stay up.
  2. Decide the scenario: ride out, shut down gracefully, or keep working.
  3. Pick the runtime that scenario needs.
  4. Select a unit delivering that runtime at your measured load, not at its rated capacity.
  5. Add 20–25% headroom.
  6. Choose topology based on power quality and sensitivity.
  7. Configure and test the shutdown integration.
  8. Record the install date, set the replacement reminder, and book the annual load test.

Step seven is where most installations stop short, and step eight is why so many UPS units protect nothing at all by year four.